Rehabilitation of Bridge #31 - Ontario Street and Bridge #30 - Ann Street, Over Silver Creek.
Nature of Work
The work under this Contract involves the rehabilitation of Bridge #30 (Ann Street) and Bridge #31 (Ontario Street). Works include dewatering, removal and reconstruction of reinforced concrete bridge decks for Bridge #30 (Ann Street) and Bridge #31 (Ontario Street), channel works, installation of guiderail, and site restoration works.
Dates
Location
Ontario Street and Ann Street between Main St North and Ewing Street, Georgetown.
Remarks
Ontario Street will be open to local traffic only on either side of the bridge. Ontario Street bridge (Bridge #31) will be closed to ALL through traffic with a posted detour route on Ewing Street/Main Street North to access properties on either side of Bridge #31.
Ann Street will be open to local traffic and the Ann Street bridge (Bridge #30) will be open during construction.
Contractor
2585284 Ontario Inc. o/a Beton
Contractor Contact:
Matin Khashe
T: 416-844-4341
E: [email protected]
Consultant Contact:
William Van Ruyven
T: 647-280-5895
E: [email protected]
Town Contact:
Michelle Mathies
T: 905-873-2600 ext. 2319
E: [email protected]
Rehabilitation of Ontario Street and Ann Street Bridges Site Location Map